This Nike Air Force 1 Low “Easter” Is A Bit Behind Schedule

7837

The Easter 2022 holiday may be in our rear view mirrors, but Nike is still pumping out pastel-colored kicks that ostensibly call out to the mid-Spring holiday. Although these do not appear to be an official Easter drop, there’s no denying the association between the holiday and this classic mix of pastel tones. In fact, we’ve seen this exact palette make an appearance on earlier Air Force 1 “Easter” drops of the past, so these are simply a must for anyone looking to add to that assortment.

This upcoming Air Force 1 is built completely with a tumbled leather upper, with smooth leather finishing the white Swoosh logos. Muted shades of pink, blue, yellow, and green are scattered throughout, offset by white laces and a silver lace dubrae. The only thing missing from these is the cracked Easter egg logo seen in releases past, but even without that trademark, these are a great option for the remaining springtime weeks.

A release date is coming soon, so stay tuned for updates. In other AF1 news, check out the store list for the Air Force 1 Billie.

Previous articleThe Nike Air Max Plus Boasts Big Mesh In Orange
Next articleThis Nike Air Max 97 Channels The Spirit Of The “Sport Red” Air Max 1